Supporting Infrastructures - Water, Elec

Water supply: Hani river 1 km east of the project; open pit mining for infiltrated water.

Electric power: 110kv Muren power station 10km west of the project, with an existing capacity of 80,000 kVA can meet the needs of capital construction and phase I of the project.

Road: There is an hardened dirt road 10km west of the project; the road will be reinforced by Earthzyme solution for the needs of construction and production until G335 highway will have been built.

Railroad: Three railway stations are around the project and can be used for the Group’s products transportation, among them, Hailitu Railway Station has an annual transport capacity of 30 million tons.